Specialist teaching labs, staffrooms and admin blocks
Specialist modular science labs, staffrooms and admin blocks start from €115,000 ex VAT refurbished/fitted or €580 to €940/wk leased, with factory-installed services and fast holiday crane placement.
Modular science rooms, ICT suites, staff kitchens and secure reception offices built off site with high-density M&E, data and extract systems.
Free, no obligation. One local supplier prices it, not five.
- From €115,000specialist modular unit, ex VAT
- €580–€940/wk12–24 mo lab/admin hire, ex VAT
- 3-phase ESBtypically required for multi-bay labs
- Part B & Mfull FSC & DAC statutory compliance

Modular space beyond general classrooms
Growing post-primary schools and expanding primary campuses rarely run short of general classrooms alone. Adding 150 extra pupils quickly overwhelms existing staffrooms, administrative offices, science laboratories and practical woodwork or computer rooms. Factory-fitted modular blocks let schools add specialist spaces rapidly without carving up existing teaching rooms.
Secondary science lab & prep room
- Typical footprint
- 95 to 120 m²
- M&E & interior fit-out specifics
- Chemical-resistant benches, sinks, fume extract, emergency gas/water shut-off, prep store
- Budget guide (ex VAT)
- Buy new €205,000–€298,000 / Hire €580–€940/wk
ICT, DCG & coding suite
- Typical footprint
- 70 to 90 m²
- M&E & interior fit-out specifics
- Perimeter dado power/Cat6A trunking, cooling split AC, glare-free lighting, server rack
- Budget guide (ex VAT)
- Refurb €84,000–€134,000 / Buy new €205,000–€298,000
Staffroom & kitchenette block
- Typical footprint
- 50 to 90 m²
- M&E & interior fit-out specifics
- Commercial-grade tea station, dishwasher/zip-tap, acoustic meeting booth, staff WCs
- Budget guide (ex VAT)
- Refurb €66,000–€110,000 / Hire €410–€720/wk
Reception, principal & admin wing
- Typical footprint
- 60 to 120 m²
- M&E & interior fit-out specifics
- Secure fobbed foyer, sliding reception hatch, principal office, sick bay, print room
- Budget guide (ex VAT)
- Refurb €84,000–€134,000 / Buy new €205,000–€298,000
Specialist blocks carry higher mechanical and electrical density than dry general classrooms. Check three-phase ESB load and foul drainage early, especially when fitting chemical dilution traps, extract fans or multi-tap kitchenettes.
Price my units
Four quick taps show Irish unit hire or capital guides before asking for a contact number. One local supplier prices it, not five.
Specialist teaching labs or staffroom units, 1 unit, new turnkey purchase: €205,000 to €298,000 ex VAT.
How the unit guide is worked out
Weekly hire bands reflect standard Irish 12 to 24 month and 36+ month education lease rates per classroom module, excluding VAT (23% on rental). One-off mobilisation and demobilisation covers low-loader haulage, mobile crane lifts, concrete pad setup and end-of-lease removal. Refurbished capital ranges cover pre-owned stock units overhauled before delivery. New turnkey ranges reflect multi-unit Irish school block pricing at €2,300 to €3,500/m² ex VAT (13.5% VAT on qualifying supply-and-fit construction). ESB Networks three-phase upgrades, foul pump stations and link corridors depend on yard survey.
Fit-out details to specify up front
- Floor loading and vibration stiffness. Practical woodwork, engineering workshops and heavy science benches need reinforced floor joists and welded heavy-duty chemical-resistant vinyl.
- Extract ventilation and cooling. Computer suites packed with 30 desktops and labs with Bunsen work generate substantial heat; specify heat-recovery ventilation plus inverter cooling units.
- Dedicated Cat6A fibre uplink. Pull twin ducted fibre or armoured Cat6A cabling from the school's main comms cabinet during foundation trenching so Wi-Fi and interactive panels run reliably.
- Fire compartmentation for prep rooms and stores. Chemical prep rooms and server closets require upgraded fire-rated partitions, self-closing doors and integrated I.S. 3218 detection.
Related modular unit guides
Three-phase ESB & foul drainageESB Networks IMIC load applications, three-phase sub-mains and gravity vs pumped foul tie-ins.
Multi-classroom 2-storey blocks4 to 12 room school campus wings with stairs, lifts, circulation and turnkey €/m² rates.
FSC, DAC, ramps & link corridorsFire Safety Certificates, Disability Access Certificates, ramps and covered school walkways.
Hire vs buy vs refurbishedThree-year total cost maths including haulage, mobile crane lifts and end-of-lease removal.
Unit hire & block pricesFull Irish unit pricing across weekly hire, refurbished purchase, new blocks and civils.
Summer & Easter crane deliveryBackwards scheduling from September opening so crane lifts happen on an empty yard.Common questions from school boards
Can you hire a modular science lab or staffroom rather than buying?
Yes. Specialist modular units are available on 24 to 36+ month leases from €520 to €840/wk ex VAT, though bespoke laboratory benching and fume cupboards are usually bought or amortised across longer lease terms.
Do modular staffrooms and admin blocks need a Disability Access Certificate?
Yes. Non-domestic school buildings accessed by staff, parents and visitors must comply with Part M accessibility, including ramps, 900 mm+ clear door openings and accessible sanitary facilities.
How much electrical load does a modular ICT or science block need?
A single specialist unit with electric heating, cooling, 30 workstations or lab appliances often demands a dedicated 63 A sub-main off a three-phase distribution board.
Every modular classrooms guide and county page
Units & campus blocks
Hiring, crane & compliance
Regional logistics
modularclassrooms.ie is an independent Irish information site. It is not affiliated with the Department of Education, the NCSE or any local authority, and does not allocate school capital or hire grants.

Check your unit rate before anyone phones
Pick the unit format, room count and hire or purchase route. When you want a site-verified quotation, your outline reaches a single local modular supplier in your county.