Decant classrooms during school rebuilds and roof works

Decant swing classrooms keep teaching on campus during roof replacements and school rebuilds from €480/wk ex VAT per unit, installed over school holidays and craned away once works finish.

Safe on-campus swing classrooms, staffrooms and WC blocks hired for 12 to 36 months while permanent school construction runs.

Free, no obligation. One local supplier prices it, not five.

  • From €480/wkper decant classroom hired, ex VAT
  • 6–12 wksmulti-unit decant camp setup
  • Zero lost daysteaching continues during rebuilds
  • 5 yrsClass 20D temporary window
Multi-storey timber-slatted modular building standing beside a scaffolded school rebuild and yellow site excavator

Keeping students safely on campus during major works

When an Irish school replaces an entire roof, strips out dated M&E heating plant or builds a major permanent extension, busing hundreds of pupils off site costs a fortune and disrupts families. A temporary modular decant village placed on the school pitch, spare car park or adjacent leased field keeps every class on campus while the main contractor works behind sealed hoarding.

Roof replacement or asbestos removal

Typical decant setup
2 to 4 temporary ground units
Lease window
12 months
Key logistics priority
Acoustic separation & safe pupil walkway away from scaffolding

Phased school extension (2–3 phases)

Typical decant setup
4 to 8 linked decant classrooms
Lease window
18 to 36 months
Key logistics priority
Separate contractor gate so hauliers never cross pupil drop-off

Emergency flood or fire reinstatement

Typical decant setup
1 to 6 stock rapid-deploy prefabs
Lease window
6 to 24 months
Key logistics priority
Immediate stock availability & temporary generator until ESB tie-in

Complete campus knock-and-rebuild

Typical decant setup
8 to 14 room 2-storey decant village
Lease window
24 to 36 months
Key logistics priority
Full WC blocks, staffroom, admin office and dedicated ESB meter

Successful decant programmes lock in two dates on day one: the holiday lift-in date before the main builder takes possession, and the crane-out removal date once snagging completes so your playing field or tarmac yard is handed back cleanly.

Price my units

Four quick taps show Irish unit hire or capital guides before asking for a contact number. One local supplier prices it, not five.

Decant swing classrooms during school works, 4 to 6 units, 12 to 24 month lease: €1,820 to €4,730/wk ex VAT plus €48,000 to €88,000 one-off delivery, crane & removal.

Step 1 of 5

What kind of classroom units do you need?

Pick the closest fit. A supplier checks yard levels and tie-ins on site.

How the unit guide is worked out

Weekly hire bands reflect standard Irish 12 to 24 month and 36+ month education lease rates per classroom module, excluding VAT (23% on rental). One-off mobilisation and demobilisation covers low-loader haulage, mobile crane lifts, concrete pad setup and end-of-lease removal. Refurbished capital ranges cover pre-owned stock units overhauled before delivery. New turnkey ranges reflect multi-unit Irish school block pricing at €2,300 to €3,500/m² ex VAT (13.5% VAT on qualifying supply-and-fit construction). ESB Networks three-phase upgrades, foul pump stations and link corridors depend on yard survey.

Site segregation, temporary utilities and handback

Running an active decant campus next to a live building site demands clear physical boundaries before term starts:

  1. Segregated pedestrian routes and fencing. Solid 2.4 m plywood or steel hoarding separates the decant classrooms and play area from contractor traffic, cranes and skip lorries.
  2. Independent or sub-metered power and fire panels. Because the main building's power and fire system may be isolated during strip-out, wire the decant cluster with an independent distribution board and dedicated I.S. 3218 fire alarm link.
  3. Temporary tarmac or matting paths. Wet Irish winters turn grass approaches to mud within days; specify temporary macadam walkways or heavy-duty ground-protection mats to every Part M ramp.
  4. Written reinstatement spec for playing pitches. Agree topsoil stripping, geotextile membranes under stone pads and final re-seeding or tarmac patching before the first crane arrives.

Plan your changeover dates with Easter and Summer crane scheduling and end-of-lease removal.

Common questions from school boards

How much do decant classrooms cost for a school rebuild?

Hiring a 2 to 3 classroom decant cluster runs €960 to €2,490/wk ex VAT plus €26,000 to €48,000 one-off mobilisation, craneage and removal. A 4 to 6 unit cluster runs €1,820 to €4,730/wk plus €48,000 to €88,000.

Can decant classrooms sit on a grass GAA or soccer pitch?

Yes, using non-invasive stone crane mats, geotextile membranes and precast concrete pads so sub-bases lift cleanly at the end of the lease without ruining pitch drainage.

Who coordinates the decant supplier with our main building contractor?

The school's design team or project supervisor (PSDP/PSCS) sets site boundaries, utility isolation dates and crane sequencing so decant modules sit clear of the permanent build footprint.

What happens if our main school rebuild overruns by six months?

Most Irish modular hire leases move to a pre-agreed monthly rolling extension after the initial fixed term. Confirm that extension rate in your original contract.

Every modular classrooms guide and county page

modularclassrooms.ie is an independent Irish information site. It is not affiliated with the Department of Education, the NCSE or any local authority, and does not allocate school capital or hire grants.

Two-storey modern school campus building with grid windows, gravel footpath and staked young trees on a green lawn

Check your unit rate before anyone phones

Pick the unit format, room count and hire or purchase route. When you want a site-verified quotation, your outline reaches a single local modular supplier in your county.