Modular classroom hire and unit prices in Ireland
Hiring a single temporary prefabricated classroom in Ireland runs €450 to €850 per week ex VAT on a 12 to 36 month lease. Budget a separate one-off mobilisation and demobilisation allowance of €14,000 to €24,000 ex VAT for low-loader haulage, mobile crane lifts, pad setup and end-of-lease removal. Multi-unit permanent modular school blocks (4 to 12 classrooms across one or two storeys) typically price at €2,300 to €3,500/m² turnkey ex VAT, covering factory steel modules, crane assembly, staircases, acoustic finishes and standard pad foundations before abnormal ESB or drainage upgrades.
Line-by-line Irish ex VAT budgets for 12 to 36 month prefab leases, refurbished stock units, multi-classroom blocks, craneage, pads and end-of-lease removal.
Free, no obligation. One local supplier prices it, not five.
- €450–€850/wktemporary prefab classroom hire, ex VAT
- €2,300–€3,500/m²multi-unit permanent block turnkey, ex VAT
- From €68,000refurbished pre-owned unit, ex VAT
- €14,000–€24,0001-unit delivery, crane & removal

Unit costs by modular classroom format
Ex VAT guide rates across hire fleets, refurbished stock and permanent campus blocks.

Temporary prefab classroom hire
€450–€850/wkSingle or linked classrooms on 12, 24 or 36 month leases, ex VAT- 12 to 24 month lease (1 unit)€500–€850/wk
- 36+ month lease (1 unit)€450–€760/wk
- Delivery, crane & removal (1 unit)€14,000–€24,000
- Stock fleet handover4–8 wks

Multi-classroom 2-storey school block
€2,300–€3,500/m²4 to 12 room campus blocks with stairs, lifts and circulation, ex VAT- 4 to 6 units (new turnkey)€730,000–€1,596,000
- 7+ units (new turnkey)€1,248,000–€2,744,000
- 4 to 6 units (36+ mo hire)€1,820–€4,620/wk
- Build to handover14–24 wks

Refurbished & relocated prefabs
From €68,000Overhauled pre-owned modules craned onto prepared pads, ex VAT- 1 refurbished classroom€68,000–€105,000
- 2 to 3 refurbished cluster€136,000–€315,000
- Same-site yard relocation€8,500–€18,000
- Stock overhaul lead time5–10 wks

Decant classrooms for rebuilds
From €480/wkRapid temporary teaching blocks while main school works run, ex VAT- 2 to 3 unit decant (12–24 mo)€960–€2,490/wk
- 4 to 6 unit decant (12–24 mo)€1,820–€4,730/wk
- Mob, crane & removal (4–6 units)€48,000–€88,000
- Cluster deployment6–12 wks

Specialist labs, staffrooms & admin
From €115,000Science benches, ICT rooms, staff lounges and principal offices, ex VAT- 12 to 24 month lease (1 unit)€580–€940/wk
- Refurbished specialist shell€84,000–€134,000
- New turnkey lab/admin unit€205,000–€298,000
- Three-phase ESB sub-main€8,500–€28,000

Childcare, afterschool & ETB hubs
From €420/wkTusla-ready rooms, wraparound care and ETB adult workshops, ex VAT- 36+ month lease (1 unit)€410–€720/wk
- Refurbished unit purchase€66,000–€110,000
- New turnkey room€176,000–€268,000
- Part M entrance ramp€6,500–€16,500
Haulage, craneage, services and removal line items
Abnormal-load haulage (one way)
€1,500 to €4,000
Per modular bay from supplier depot; Garda or private escorts extra on wide loads.
Mobile crane hire (standard day)
€1,200 to €3,500
40 t to 80 t mobile crane with slinger/signaller and lift supervisor for single-storey bays.
All-terrain heavy crane (multi-storey)
€3,200 to €6,800
100 t to 200 t crane required for deep yard reaches or lifting over existing roofs.
Concrete pad foundations (1 unit)
€6,500 to €14,000
Excavation, reinforced concrete pads or piers and levelling packers on sound ground.
Pad & ring-beam civils (4-unit block)
€22,000 to €48,000
Engineered pads, tie-down plates and perimeter plinths for 2-storey school wings.
Covered glazed link corridor
€2,800 to €5,200/m
Weatherproof insulated walkway linking the modular block to an existing school door.
Part M accessible ramp & landing
€6,500 to €16,500
Galvanised steel or concrete 1:20 / 1:15 ramp with double handrails and kerbs.
Three-phase ESB sub-main & MIC
€8,500 to €28,000
Armoured SWA cable trenching, distribution board and ESB Networks load upgrade prep.
Gravity foul drainage tie-in
€4,500 to €14,000
110 mm / 160 mm uPVC foul line, inspection chambers and connection to school manhole.
Packaged foul pump station
€7,500 to €16,000
Needed where classroom WC floor level sits below the existing foul sewer invert.
End-of-lease crane removal
€4,500 to €9,500/unit
M&E strip-out, mobile crane lift onto low-loaders and return haulage to hire depot.
FSC & DAC consultant pack
€6,500 to €16,000
Fire engineering drawings, Part M access pack and council statutory application fees.
Compare total three-year cashflow across every procurement option on hire vs buy vs refurbished.
Price my units
Four quick taps show Irish unit hire or capital guides before asking for a contact number. One local supplier prices it, not five.
Temporary prefab classroom hire, 2 to 3 units, 12 to 24 month lease: €1,000 to €2,550/wk ex VAT plus €26,000 to €48,000 one-off delivery, crane & removal.
How the unit guide is worked out
Weekly hire bands reflect standard Irish 12 to 24 month and 36+ month education lease rates per classroom module, excluding VAT (23% on rental). One-off mobilisation and demobilisation covers low-loader haulage, mobile crane lifts, concrete pad setup and end-of-lease removal. Refurbished capital ranges cover pre-owned stock units overhauled before delivery. New turnkey ranges reflect multi-unit Irish school block pricing at €2,300 to €3,500/m² ex VAT (13.5% VAT on qualifying supply-and-fit construction). ESB Networks three-phase upgrades, foul pump stations and link corridors depend on yard survey.
Six site variables that move an Irish unit quote
- Lease term length (12 vs 36 months). Signing a 36-month hire term typically trims weekly classroom rent by 10% to 15% compared with a 12-month emergency lease.
- Crane reach and overhead powerlines. Lifting over an existing school roof or boundary wall pushes crane hire from an 80-tonne unit to a 160-tonne all-terrain rig.
- Single-storey versus stacked 2-storey. Stacking units saves precious yard play space but adds external or internal stairs, lift provision and fire compartmentation.
- Wet rooms, WCs and science plumbing. Dry general classrooms tie in quickly with power and data; toilets, sinks and labs add drainage trenches and pump risks.
- ESB spare capacity on site. Older rural schools on single-phase supply must budget for ESB Networks three-phase conversion when adding multiple heated modules.
- VAT treatment (23% vs 13.5%). Prefab rental and supply-only sales carry 23% VAT; qualifying permanent supply-and-fit contracts carry 13.5% VAT.
Ten items every written classroom tender should list
Use this checklist before putting a Board of Management signature on a hire or build contract.
- Weekly hire rate versus total lease spend. Confirm the exact weekly fee, minimum lease period (12, 24 or 36 months) and extension roll-over rate.
- One-way haulage and abnormal-load escorts. Ask whether low-loader delivery from the supplier depot includes Garda escort or council road permits.
- Mobile crane capacity and lift plan. Verify crane tonnage, spreader beams, outrigger timber mats, slinger crew and lift insurance are priced in.
- End-of-lease removal and site reinstatement. Get the crane-out, disconnection, haulage-back and tarmac or grass repair charges written down on day one.
- Concrete pad foundations and levelling jacks. State clearly who excavates, pours concrete pads or sets jackleg piers prior to crane day.
- Three-phase ESB load and sub-main cabling. Confirm total kVA demand, armoured SWA sub-main routing and Safe Electric certification.
- Foul and stormwater drainage tie-ins. Verify gravity sewer falls or whether a packaged foul pump station is required for unit toilets.
- Part M entrance ramps and link corridors. Price galvanised wheelchair ramps, landings, canopies and weatherproof enclosed walkways upfront.
- FSC, DAC and fire alarm integration. Confirm I.S. 3218 fire alarm linking to the main school panel and who lodges FSC and DAC packs.
- Holiday handover dates and liquidated slippage cover. Lock in exact Easter or July–August crane dates so September classes start on schedule.
Common questions from school boards
What is the realistic weekly rent for a school prefab in Ireland?
Hiring a single temporary prefabricated classroom in Ireland runs €450 to €850 per week ex VAT on a 12 to 36 month lease. Budget a separate one-off mobilisation and demobilisation allowance of €14,000 to €24,000 ex VAT for low-loader haulage, mobile crane lifts, pad setup and end-of-lease removal.
How much does it cost to buy a 4-classroom 2-storey modular block?
A 4 to 6 classroom permanent two-storey block (roughly 350 to 500 m²) generally lands between €730,000 to €1,596,000 ex VAT turnkey, equating to €2,300 to €3,500/m² before abnormal civils.
How much cheaper is a refurbished prefab than a new modular classroom?
Refurbished pre-owned units run €68,000 to €105,000 ex VAT per classroom compared with €184,000 to €272,000 for a brand-new permanent unit, saving roughly half the capital cost for rapid multi-year use.
Why are mobilisation and removal fees quoted separately on hire contracts?
Transport, cranes and pad foundations are fixed one-off costs regardless of whether the school keeps the classroom for 12 months or 48 months. Separating them keeps the weekly lease transparent.
Are link corridors and wheelchair ramps included in headline unit rates?
Rarely. Enclosed link corridors typically add €2,800 to €5,200 per linear metre and Part M accessible ramps add €6,500 to €16,500 ex VAT.
Does modular classroom hire carry 13.5% or 23% VAT?
Modular classroom leasing and supply-only prefab sales carry 23% VAT in Ireland. Qualifying fixed turnkey supply-and-install construction contracts carry 13.5% VAT under Revenue's two-thirds rule.
Every modular classrooms guide and county page
Units & campus blocks
Hiring, crane & compliance
Regional logistics
modularclassrooms.ie is an independent Irish information site. It is not affiliated with the Department of Education, the NCSE or any local authority, and does not allocate school capital or hire grants.

Check your unit rate before anyone phones
Pick the unit format, room count and hire or purchase route. When you want a site-verified quotation, your outline reaches a single local modular supplier in your county.