Refurbished and relocated pre-owned school prefabs
Pre-owned refurbished school prefabs start from €68,000 to €105,000 per classroom unit ex VAT, delivered and craned in 5 to 10 weeks after fresh flooring, re-cladding checks, LED lighting and electrical certification.
Workshop-overhauled steel modular classrooms ready in 5 to 10 weeks at roughly half the capital outlay of new-build units.
Free, no obligation. One local supplier prices it, not five.
- From €68,000refurbished classroom unit, ex VAT
- 5 to 10 weeksdepot overhaul to school handover
- 40% to 55%typical capital saving vs brand-new
- €8,500–€18,000same-yard prefab relocation

How pre-owned school prefabs cut cost and delivery time
A structurally sound steel-framed modular classroom coming off a three-year corporate or school lease still has decades of frame life remaining. Rather than waiting 16 to 24 weeks for a factory build slot, schools can purchase an overhauled pre-owned module straight from an Irish hire depot for roughly half the outlay of a brand-new permanent unit.
1 refurbished single classroom
- Guide cost (ex VAT)
- €68,000–€105,000
- Typical lead time
- 5–10 wks
- Typical use
- Immediate enrolment surge on tight capital
2 to 3 refurbished linked cluster
- Guide cost (ex VAT)
- €136,000–€315,000
- Typical lead time
- 6–12 wks
- Typical use
- Multi-class intake needed by September
Relocate school's own prefab (same site)
- Guide cost (ex VAT)
- €8,500–€18,000
- Typical lead time
- 2–4 wks
- Typical use
- Clearing a footprint for a new school build
Relocate prefab to another campus
- Guide cost (ex VAT)
- €14,000–€29,000
- Typical lead time
- 4–6 wks
- Typical use
- ETB or patron transferring surplus unit
Overhaul work happens in the supplier's workshop before delivery: roofs are pressure-tested and re-membraned where needed, worn vinyl is stripped and replaced with heavy-duty safety flooring, fluorescent tubes upgrade to LED panels, electrical distribution boards are re-tested and exterior cladding is washed, repaired or resprayed in school colours.
Price my units
Four quick taps show Irish unit hire or capital guides before asking for a contact number. One local supplier prices it, not five.
A refurbished pre-owned prefab classroom, 1 unit, refurbished capital purchase: €68,000 to €105,000 ex VAT.
How the unit guide is worked out
Weekly hire bands reflect standard Irish 12 to 24 month and 36+ month education lease rates per classroom module, excluding VAT (23% on rental). One-off mobilisation and demobilisation covers low-loader haulage, mobile crane lifts, concrete pad setup and end-of-lease removal. Refurbished capital ranges cover pre-owned stock units overhauled before delivery. New turnkey ranges reflect multi-unit Irish school block pricing at €2,300 to €3,500/m² ex VAT (13.5% VAT on qualifying supply-and-fit construction). ESB Networks three-phase upgrades, foul pump stations and link corridors depend on yard survey.
What to inspect before buying a used prefab classroom
Never buy a secondhand modular unit off photos alone. Send your project engineer or facilities officer to inspect the steel chassis and envelope in the yard before paying a deposit:
- Galvanised chassis and corner posts. Check underneath for deep rust flaking on cross-bearers and lifting eyes before crane straps attach.
- Roof membrane seams and parapet flashings. Standing water around old flat-roof joints is the main failure point on ageing prefabs; insist on a fresh EPDM or PVC roof overlay warranty.
- Thermal insulation and glazing age. Verify double-glazed uPVC or thermally broken aluminium windows have intact seals and check wall U-values if aiming for long-term use.
- Electrical certification and fire compliance. Confirm a fresh Safe Electric periodic inspection report, emergency lighting test and compliant fire-alarm base wiring.
- Original FSC/DAC drawings or structural cert. Having steel-frame structural calculations from the supplier makes local Building Control filings much faster.
Already own prefabs on campus that need shifting out of a builder's way? Read relocation and demobilisation.
Related modular unit guides
Temporary prefab classroom hireWeekly lease rates for 12, 24 and 36 month terms plus honest crane and removal costs.
Hire vs buy vs refurbishedThree-year total cost maths including haulage, mobile crane lifts and end-of-lease removal.
Relocation, removal & reinstatementMoving existing prefabs, reversing crane lifts and restoring school tarmac or grass.
Summer & Easter crane deliveryBackwards scheduling from September opening so crane lifts happen on an empty yard.
FSC, DAC, ramps & link corridorsFire Safety Certificates, Disability Access Certificates, ramps and covered school walkways.
Unit hire & block pricesFull Irish unit pricing across weekly hire, refurbished purchase, new blocks and civils.Common questions from school boards
How much does a refurbished school prefab cost in Ireland?
Pre-owned refurbished school prefabs start from €68,000 to €105,000 per classroom unit ex VAT, delivered and craned in 5 to 10 weeks after fresh flooring, re-cladding checks, LED lighting and electrical certification.
How fast can a refurbished prefab classroom be delivered?
Depot-held stock typically takes 5 to 10 weeks for workshop refurbishment, pad prep and crane installation.
Can a refurbished prefab be resold or moved later?
Yes. Because you own the steel-framed module outright, your school or ETB can relocate it to another site or sell it back into the Irish used modular market once permanent rooms open.
Does a pre-owned classroom still need FSC and DAC?
Yes. Installing a relocated or pre-owned modular building onto a school yard triggers Irish Building Control requirements for fire safety and accessibility.
Every modular classrooms guide and county page
Units & campus blocks
Hiring, crane & compliance
Regional logistics
modularclassrooms.ie is an independent Irish information site. It is not affiliated with the Department of Education, the NCSE or any local authority, and does not allocate school capital or hire grants.

Check your unit rate before anyone phones
Pick the unit format, room count and hire or purchase route. When you want a site-verified quotation, your outline reaches a single local modular supplier in your county.
