Three-phase ESB power and foul drainage tie-ins
Multi-unit heated modular classrooms normally need three-phase power (€8,500 to €28,000 sub-main & prep) and verified TGD Part H foul drainage (€4,500 to €14,000 gravity or €7,500 to €16,000 pumped).
Sizing electrical kVA capacity, applying for ESB Networks IMIC upgrades and verifying foul sewer falls before craning modular classrooms onto your school yard.
Free, no obligation. One local supplier prices it, not five.
- €8,500–€28,000three-phase sub-main & ESB prep
- €4,500–€14,000gravity foul drainage tie-in
- €7,500–€16,000packaged foul pump station
- TGD Part HIrish drainage compliance standard

Checking ESB three-phase load before ordering units
Electricity capacity is the single most common surprise delay on Irish school modular projects. Older rural primary schools frequently run on a modest single-phase ESB supply that trips the moment two or three electric-heated classrooms, water heaters and interactive whiteboards switch on together on a cold January morning.
Single-phase vs three-phase ESB
- When upgrades trigger
- Adding 2+ electrically heated or heat-pump classrooms
- Key approval / standard
- ESB Networks Increase Maximum Import Capacity (IMIC) online application & Safe Electric (RECI) completion certificate
- Typical Irish cost (ex VAT)
- €8,500–€28,000
Armoured SWA sub-main trench
- When upgrades trigger
- Every remote yard classroom block fed from main board
- Key approval / standard
- Ducted underground SWA cable + warning tape
- Typical Irish cost (ex VAT)
- Included above (length-dependent)
Gravity foul sewer tie-in
- When upgrades trigger
- Units with WCs, labs or sinks above nearest manhole invert
- Key approval / standard
- TGD Part H (Drainage and Waste Disposal) (110/160 mm uPVC)
- Typical Irish cost (ex VAT)
- €4,500–€14,000
Packaged foul pump station
- When upgrades trigger
- Low-lying yard where gravity fall to sewer is impossible
- Key approval / standard
- Twin-pump chamber, high-level alarm & rising main
- Typical Irish cost (ex VAT)
- €7,500–€16,000
Have a Registered Electrical Contractor calculate your existing maximum demand plus the proposed modular load right at survey stage. If total kVA exceeds your school's existing Maximum Import Capacity (MIC), lodge an Increase Maximum Import Capacity (IMIC) application on the ESB Networks portal immediately. Where local pole transformers need reinforcement, ESB lead times can run several months.
Price my units
Four quick taps show Irish unit hire or capital guides before asking for a contact number. One local supplier prices it, not five.
A multi-classroom 2-storey campus block, 4 to 6 units, new turnkey purchase: €730,000 to €1,596,000 ex VAT.
How the unit guide is worked out
Weekly hire bands reflect standard Irish 12 to 24 month and 36+ month education lease rates per classroom module, excluding VAT (23% on rental). One-off mobilisation and demobilisation covers low-loader haulage, mobile crane lifts, concrete pad setup and end-of-lease removal. Refurbished capital ranges cover pre-owned stock units overhauled before delivery. New turnkey ranges reflect multi-unit Irish school block pricing at €2,300 to €3,500/m² ex VAT (13.5% VAT on qualifying supply-and-fit construction). ESB Networks three-phase upgrades, foul pump stations and link corridors depend on yard survey.
Foul drainage, stormwater and school fibre tie-ins
Coordinating underground trenches in one excavation pass before concrete pads are poured avoids digging up the school yard twice:
- Lift manhole lids to check foul invert depth. Measure the invert level of the nearest school foul manhole relative to finished modular floor height. A 1:40 or 1:60 gravity fall avoids the maintenance cost of a packaged sewage pump station.
- Separate stormwater downpipes properly. Roof rainwater from a 4-classroom block must route to a surface-water drain or engineered soakaway, never illegally into the foul sewer.
- Pull mains water with frost-protected insulation. Bury insulated MDPE water pipe at least 750 mm deep with an accessible isolation stopcock outside each modular block.
- Include spare 100 mm telecoms & fire-alarm ducts. Lay dedicated ducts for Cat6A/fibre broadband, intercoms, bell systems and the I.S. 3218 fire alarm link back to the main building.
Related modular unit guides
Multi-classroom 2-storey blocks4 to 12 room school campus wings with stairs, lifts, circulation and turnkey €/m² rates.
Labs, staffrooms & admin blocksScience labs, ICT rooms, staff kitchens and reception offices built off site.
Decant classrooms for rebuildsKeeping every class teaching on site during roof replacements, extensions and M&E upgrades.
Summer & Easter crane deliveryBackwards scheduling from September opening so crane lifts happen on an empty yard.
FSC, DAC, ramps & link corridorsFire Safety Certificates, Disability Access Certificates, ramps and covered school walkways.
Unit hire & block pricesFull Irish unit pricing across weekly hire, refurbished purchase, new blocks and civils.Common questions from school boards
Can two modular classrooms run on a single-phase school supply?
Rarely without tripping if electrically heated. Adding two or more classrooms almost always calls for a three-phase distribution board and a verified ESB Networks MIC headroom check.
How long does an ESB Networks MIC upgrade take for an Irish school?
Simple administrative upgrades with spare local capacity can clear in weeks; upgrades needing new underground mains or transformer work take several months. Apply before ordering modules.
When does a modular classroom need a packaged foul pump station?
Whenever a unit with toilets or lab sinks sits too low or too far from the nearest foul manhole to achieve compliant gravity fall under TGD Part H. Budget €7,500 to €16,000 ex VAT.
Who certifies the electrical connection to a modular classroom?
A Registered Electrical Contractor (Safe Electric (RECI) completion certificate) must test the armoured sub-main, earthing and internal circuits and issue a Completion Certificate prior to handover.
Every modular classrooms guide and county page
Units & campus blocks
Hiring, crane & compliance
Regional logistics
modularclassrooms.ie is an independent Irish information site. It is not affiliated with the Department of Education, the NCSE or any local authority, and does not allocate school capital or hire grants.

Check your unit rate before anyone phones
Pick the unit format, room count and hire or purchase route. When you want a site-verified quotation, your outline reaches a single local modular supplier in your county.