Hiring vs buying vs refurbished modular classrooms
Hiring makes sense for 12 to 24 month decants and fixed rebuilds; beyond 30 months, buying a refurbished prefab (€68,000–€105,000 ex VAT) typically beats cumulative rent plus removal fees.
Three-year whole-life maths comparing weekly prefab leases, pre-owned refurbished stock and permanent multi-unit blocks with all crane and removal charges included.
Free, no obligation. One local supplier prices it, not five.
- 24 to 30 motypical lease vs refurbished break-even
- €14,000–€24,0001-unit hire delivery, crane & removal
- From €68,000pre-owned refurbished buy, ex VAT
- €2,300–€3,500/m²new permanent multi-unit block

The honest three-year cashflow comparison
Boards of management often compare a weekly prefab rental quote against a purchase price without tallying transport, craneage, pad foundations and end-of-lease removal. On a single 12-month emergency decant, hiring wins hands down. Once a temporary classroom stays on the school yard into year three, cumulative rent plus crane-in and crane-out fees catches up with buying a workshop-refurbished pre-owned prefab outright.
12-Month Hire (1 unit)
- Weekly rental spend
- €26,000–€44,200 (52 wks)
- Capital unit purchase
- €0
- Haulage, crane & pads
- €9,500–€14,500 (in)
- End-of-lease removal
- €4,500–€9,500
- Total 3-year cashflow (ex VAT)
- €40,000–€68,200 (1 yr)
36-Month Hire (1 unit)
- Weekly rental spend
- €70,200–€118,560 (156 wks)
- Capital unit purchase
- €0
- Haulage, crane & pads
- €9,500–€14,500 (in)
- End-of-lease removal
- €4,500–€9,500
- Total 3-year cashflow (ex VAT)
- €84,200–€142,560 (3 yrs)
Buy Refurbished (1 unit)
- Weekly rental spend
- €0
- Capital unit purchase
- €68,000–€105,000
- Haulage, crane & pads
- Included in installed guide
- End-of-lease removal
- €0 (retained / resale asset)
- Total 3-year cashflow (ex VAT)
- €68,000–€105,000
Buy New Block (per unit)
- Weekly rental spend
- €0
- Capital unit purchase
- €184,000–€272,000
- Haulage, crane & pads
- Included in turnkey guide
- End-of-lease removal
- €0 (permanent asset)
- Total 3-year cashflow (ex VAT)
- €184,000–€272,000
All figures above are stated ex VAT. Remember that modular leasing and supply-only sales carry 23% VAT in Ireland, whereas qualifying permanently fixed supply-and-install contracts qualify for 13.5% VAT. See every individual logistics charge on Irish modular classroom prices.
Price my units
Four quick taps show Irish unit hire or capital guides before asking for a contact number. One local supplier prices it, not five.
Temporary prefab classroom hire, 1 unit, 36+ month lease: €450 to €760/wk ex VAT plus €14,000 to €24,000 one-off delivery, crane & removal.
How the unit guide is worked out
Weekly hire bands reflect standard Irish 12 to 24 month and 36+ month education lease rates per classroom module, excluding VAT (23% on rental). One-off mobilisation and demobilisation covers low-loader haulage, mobile crane lifts, concrete pad setup and end-of-lease removal. Refurbished capital ranges cover pre-owned stock units overhauled before delivery. New turnkey ranges reflect multi-unit Irish school block pricing at €2,300 to €3,500/m² ex VAT (13.5% VAT on qualifying supply-and-fit construction). ESB Networks three-phase upgrades, foul pump stations and link corridors depend on yard survey.
When each route makes financial sense
- Choose 12 to 24 month hire when the exit date is certain. Ideal for decant accommodation during a contracted school roof replacement, asbestos strip-out or phased permanent extension.
- Choose a refurbished capital purchase for 3 to 7 year gaps. If permanent school expansion planning is years away, owning an overhauled steel unit avoids paying over €100,000 in dead rent and leaves you with a relocatable resale asset.
- Choose a new permanent multi-unit block for 10+ year enrolment growth. Where demographic intake is permanent across 4 to 12 rooms, a stacked permanent block delivers lower heating bills, stronger acoustic isolation and zero future crane-out expense.
- Watch hire extension traps. If a 12-month lease drags on to 48 months at full short-term weekly rent, the school ends up paying more than a refurbished purchase while still owing end-of-lease removal.
Related modular unit guides
Temporary prefab classroom hireWeekly lease rates for 12, 24 and 36 month terms plus honest crane and removal costs.
Refurbished pre-owned prefabsOverhauled stock units craned in 5 to 10 weeks for tight school budgets.
Multi-classroom 2-storey blocks4 to 12 room school campus wings with stairs, lifts, circulation and turnkey €/m² rates.
Relocation, removal & reinstatementMoving existing prefabs, reversing crane lifts and restoring school tarmac or grass.
Unit hire & block pricesFull Irish unit pricing across weekly hire, refurbished purchase, new blocks and civils.
Planning, Section 179 & retentionClass 20D 5-year temporary exemptions, Section 179 council routes and retention rules.Common questions from school boards
At what point is buying a refurbished prefab cheaper than hiring?
Usually between month 24 and month 30 on a single classroom once delivery, mobile craneage, pads and end-of-lease removal fees are counted alongside weekly rent.
Are transport and mobile crane lifts included in weekly hire quotes?
No. Suppliers quote haulage, craneage, installation and final removal as separate fixed mobilisation and demobilisation lines so the weekly rental reflects the asset alone.
Can a school convert a hired classroom into a purchase mid-lease?
Some Irish hire yards offer lease-to-buy buyout options after 12 or 24 months, crediting a portion of paid rent. Ask for any buyout formula in writing before signing.
How does VAT differ between hiring and buying modular classrooms?
Modular classroom leasing and supply-only prefab sales carry 23% VAT in Ireland. Qualifying fixed turnkey supply-and-install construction contracts carry 13.5% VAT under Revenue's two-thirds rule.
Every modular classrooms guide and county page
Units & campus blocks
Hiring, crane & compliance
Regional logistics
modularclassrooms.ie is an independent Irish information site. It is not affiliated with the Department of Education, the NCSE or any local authority, and does not allocate school capital or hire grants.

Check your unit rate before anyone phones
Pick the unit format, room count and hire or purchase route. When you want a site-verified quotation, your outline reaches a single local modular supplier in your county.
