Prefab relocation, crane removal and demobilisation
End-of-lease prefab removal runs €4,500 to €9,500/unit ex VAT, while relocating an owned classroom across a yard costs €8,500 to €18,000 or €14,000 to €29,000 between campuses.
What end-of-lease removal really costs, how owned classrooms shift between Irish school sites, and how to avoid trapping old prefabs behind new extensions.
Free, no obligation. One local supplier prices it, not five.
- €4,500–€9,500/unitend-of-lease crane removal, ex VAT
- €8,500–€18,000same-site yard relocation
- €14,000–€29,000move to another Irish school
- €55–€110/m²tarmac yard reinstatement guide

Planning the exit before the prefab even arrives
A surprising number of Irish schools sign temporary classroom leases or build new permanent extensions right in front of existing prefabs, only to realise years later that the crane can no longer reach over the new roof to lift the old units out. Thinking through relocation and demobilisation up front avoids trapped units and unexpected heavy-crane surcharges.
End-of-lease hire removal
- What the crew executes
- Safe M&E isolation, bolt strip-out, mobile crane lift onto low-loaders, return haulage
- Guide budget (ex VAT)
- €4,500–€9,500/unit
- Typical window
- First week of summer or mid-term
Same-site yard relocation
- What the crew executes
- Disconnect services, pour new pads elsewhere on campus, crane-shift and re-commission
- Guide budget (ex VAT)
- €8,500–€18,000
- Typical window
- Easter or Summer holiday
Inter-campus transfer (school to school)
- What the crew executes
- Split bays, wide-load low-loader transport, crane lift onto receiving school's new pads
- Guide budget (ex VAT)
- €14,000–€29,000
- Typical window
- Summer holiday window
Yard tarmac or pitch reinstatement
- What the crew executes
- Break out or cap concrete pads, cap ducts, re-lay macadam or re-seed playing field
- Guide budget (ex VAT)
- €55–€110/m²
- Typical window
- Straight after crane-out
Before removal week, the supplier runs a pre-demobilisation survey checking whether boundary walls, newly planted trees, outdoor canopies or permanent school wings now block the original trailer and crane path.
Price my units
Four quick taps show Irish unit hire or capital guides before asking for a contact number. One local supplier prices it, not five.
Childcare, ETB or custom modular units, 1 unit, refurbished capital purchase: €66,000 to €110,000 ex VAT.
How the unit guide is worked out
Weekly hire bands reflect standard Irish 12 to 24 month and 36+ month education lease rates per classroom module, excluding VAT (23% on rental). One-off mobilisation and demobilisation covers low-loader haulage, mobile crane lifts, concrete pad setup and end-of-lease removal. Refurbished capital ranges cover pre-owned stock units overhauled before delivery. New turnkey ranges reflect multi-unit Irish school block pricing at €2,300 to €3,500/m² ex VAT (13.5% VAT on qualifying supply-and-fit construction). ESB Networks three-phase upgrades, foul pump stations and link corridors depend on yard survey.
Step-by-step decommissioning and yard handback
- Certified utility isolation. A Safe Electric contractor safely isolates and terminates the sub-main power and fire alarm loop, while a plumber caps mains water and seals the foul sewer junction.
- Ramp, canopy and link corridor strip-down. Bolt-together Part M ramps and glazed link walkways unbolt ahead of crane day so lifting eyes on the module corners are clear.
- Weather-tight splitting and crane lift-out. Multi-bay units are unbolted along structural tie plates, sheeted if required for road transit and craned sequentially onto articulated low-loaders.
- Pad removal and surface reinstatement. Precast pads lift out cleanly with a digger; cast-in-situ concrete pads are broken down 300 mm below finished grade and reinstated with tarmac or topsoil and grass seed.
Weighing whether to relocate an owned prefab versus buying fresh stock? See refurbished and relocated prefabs.
Related modular unit guides
Temporary prefab classroom hireWeekly lease rates for 12, 24 and 36 month terms plus honest crane and removal costs.
Decant classrooms for rebuildsKeeping every class teaching on site during roof replacements, extensions and M&E upgrades.
Refurbished pre-owned prefabsOverhauled stock units craned in 5 to 10 weeks for tight school budgets.
Hire vs buy vs refurbishedThree-year total cost maths including haulage, mobile crane lifts and end-of-lease removal.
Summer & Easter crane deliveryBackwards scheduling from September opening so crane lifts happen on an empty yard.
Unit hire & block pricesFull Irish unit pricing across weekly hire, refurbished purchase, new blocks and civils.Common questions from school boards
How much does it cost to remove a hired prefab classroom at the end of a lease?
Allow €4,500 to €9,500 ex VAT per classroom unit for disconnection, mobile craneage and return haulage, plus €55 to €110/m² if tarmac patching is required.
Can an older school prefab be shifted across our yard to make way for an extension?
Yes, provided the steel chassis and corner lifting points pass structural inspection. Same-site relocation typically runs €8,500 to €18,000 ex VAT per unit plus new pads and tie-ins.
What if a new school building now blocks crane access to our old prefab?
A larger 160-tonne to 250-tonne all-terrain crane may be needed to fly bays over the new roof (adding €3,500 to €7,000+), or end-of-life timber prefabs may have to be dismantled on site instead.
Who owns the concrete pads and underground service ducts after a lease ends?
The school owns all groundworks and buried ducts permanently. Capping them cleanly allows easy reuse if future modular capacity is ever needed.
Every modular classrooms guide and county page
Units & campus blocks
Hiring, crane & compliance
Regional logistics
modularclassrooms.ie is an independent Irish information site. It is not affiliated with the Department of Education, the NCSE or any local authority, and does not allocate school capital or hire grants.