Temporary prefab classroom hire in Ireland

Hiring a single temporary prefabricated classroom in Ireland runs €450 to €850 per week ex VAT on a 12 to 36 month lease. Budget a separate one-off mobilisation and demobilisation allowance of €14,000 to €24,000 ex VAT for low-loader haulage, mobile crane lifts, pad setup and end-of-lease removal.

12, 24 and 36 month modular classroom rental rates, stock availability, craneage and end-of-lease removal fees set out plainly.

Free, no obligation. One local supplier prices it, not five.

  • €450–€850/wkper hired classroom unit, ex VAT
  • €14,000–€24,0001-unit delivery, crane & removal
  • 4 to 8 weeksstock fleet to school handover
  • 12 to 36 mostandard Irish education lease terms
Two parallel rows of white-and-anthracite steel-framed temporary prefabricated modular units with shuttered windows under cloudy skies

Irish weekly lease bands and one-off logistics

Hiring temporary prefabricated classrooms gives Irish schools immediate teaching capacity without committing large capital reserves upfront. Rental contracts are billed monthly against a quoted weekly rate (plus 23% VAT) across 12, 24 or 36 month minimum periods.

1 classroom (60–80 m²)

12–24 mo weekly
€500–€850/wk
36+ mo weekly
€450–€760/wk
One-off mob, crane & removal
€14,000–€24,000

2 to 3 linked classrooms

12–24 mo weekly
€1,000–€2,550/wk
36+ mo weekly
€900–€2,280/wk
One-off mob, crane & removal
€26,000–€48,000

4 to 6 classroom wing

12–24 mo weekly
€1,900–€4,850/wk
36+ mo weekly
€1,710–€4,330/wk
One-off mob, crane & removal
€48,000–€88,000

7+ classroom decant hub

12–24 mo weekly
€3,250–€8,330/wk
36+ mo weekly
€2,930–€7,450/wk
One-off mob, crane & removal
€80,000–€145,000

Always read the weekly rate alongside the one-off mobilisation and demobilisation schedule. Transport on wide-load low-loaders, mobile crane lifts, jackleg pad setup, service tie-ins and eventual end-of-lease removal make up a major share of total spend on short 12-month hires. Compare the full three-year cashflow on hire vs buy vs refurbished.

Price my units

Four quick taps show Irish unit hire or capital guides before asking for a contact number. One local supplier prices it, not five.

Temporary prefab classroom hire, 2 to 3 units, 12 to 24 month lease: €1,000 to €2,550/wk ex VAT plus €26,000 to €48,000 one-off delivery, crane & removal.

Step 1 of 5

What kind of classroom units do you need?

Pick the closest fit. A supplier checks yard levels and tie-ins on site.

How the unit guide is worked out

Weekly hire bands reflect standard Irish 12 to 24 month and 36+ month education lease rates per classroom module, excluding VAT (23% on rental). One-off mobilisation and demobilisation covers low-loader haulage, mobile crane lifts, concrete pad setup and end-of-lease removal. Refurbished capital ranges cover pre-owned stock units overhauled before delivery. New turnkey ranges reflect multi-unit Irish school block pricing at €2,300 to €3,500/m² ex VAT (13.5% VAT on qualifying supply-and-fit construction). ESB Networks three-phase upgrades, foul pump stations and link corridors depend on yard survey.

What a modern hired school classroom includes

Modern Irish school hire fleets bear little resemblance to cold 1990s site cabins. Education-grade hire units arrive factory-fitted with insulated steel-framed panels, commercial vinyl flooring, suspended acoustic ceilings, LED panel lighting, electric panel heaters or heat-pump split units, fire detection heads ready to link to your main panel and optional pupil or accessible WCs.

  • Minimum lease commitments. Most Irish education hire yards set a 12-month minimum term because internal layout alterations, fire-door hardware and sanitary ware are configured specifically for schools.
  • Rolling extensions after term end. Confirm the post-term weekly extension rate in writing before signing in case your permanent school extension slips by one or two academic terms.
  • Damage waiver and wear clauses. Clarify routine wear versus chargeable refurbishment (floor gouges, pinboard holes, exterior scuffs) before handover.
  • Mandatory FSC and DAC sign-off. Hiring does not waive Irish Building Control rules. See FSC, DAC, ramps and link corridors.

Common questions from school boards

How much is weekly prefab classroom hire in Ireland?

Hiring a single temporary prefabricated classroom in Ireland runs €450 to €850 per week ex VAT on a 12 to 36 month lease. Budget a separate one-off mobilisation and demobilisation allowance of €14,000 to €24,000 ex VAT for low-loader haulage, mobile crane lifts, pad setup and end-of-lease removal.

Is 36-month classroom hire cheaper per week than a 12-month lease?

Yes. Committing to a 36-month term typically drops weekly rent by roughly 10% to 15% (for example €450 to €760/wk vs €500 to €850/wk on a single unit) and spreads delivery and crane charges over three school years.

How quickly can a hired classroom open on a school yard?

Stock hire modules typically go from signed contract to pupil occupation in 4 to 8 weeks once pads, services and FSC/DAC are aligned.

Who pays to crane the prefab out when the lease ends?

The school pays end-of-lease demobilisation (€4,500 to €9,500/unit plus yard reinstatement). Ask for this figure fixed in your original hire agreement.

Every modular classrooms guide and county page

modularclassrooms.ie is an independent Irish information site. It is not affiliated with the Department of Education, the NCSE or any local authority, and does not allocate school capital or hire grants.

Two-storey modern school campus building with grid windows, gravel footpath and staked young trees on a green lawn

Check your unit rate before anyone phones

Pick the unit format, room count and hire or purchase route. When you want a site-verified quotation, your outline reaches a single local modular supplier in your county.