Modular Classrooms in Ireland, Priced by the Unit
Choose temporary hire, refurbished stock or a multi-classroom block and tell us how many units you need. View real Irish ex VAT rates on screen. Then one local supplier phones you with a written price.
Free, no obligation. One local supplier prices it, not five.
- €450 to €850/wkper temporary prefab classroom hired, ex VAT
- €2,300 to €3,500/m²multi-unit permanent school block turnkey, ex VAT
- 4 to 8 weeksstock or refurbished prefab to handover
- 3,938recognised Irish schools, Dept of Education
Six modular unit formats for Irish schools
Tap a format to check hire leases, refurbished capital costs and multi-room block rates.
Temporary prefab classroom hireFrom €450/wk per unit (12–36 mo)
Multi-classroom 2-storey school blockFrom €2,300/m² turnkey (4–12 rooms)
Refurbished & relocated prefabsFrom €68,000 per unit, ex VAT
Decant classrooms for rebuildsFrom €480/wk + craneage
Specialist labs, staffrooms & adminFrom €115,000 per unit, ex VAT
Childcare, afterschool & ETB hubsFrom €420/wk hire or €125,000 buyPrice my units
Four quick taps show Irish unit hire or capital guides before asking for a contact number. One local supplier prices it, not five.
Temporary prefab classroom hire, 2 to 3 units, 12 to 24 month lease: €1,000 to €2,550/wk ex VAT plus €26,000 to €48,000 one-off delivery, crane & removal.
How the unit guide is worked out
Weekly hire bands reflect standard Irish 12 to 24 month and 36+ month education lease rates per classroom module, excluding VAT (23% on rental). One-off mobilisation and demobilisation covers low-loader haulage, mobile crane lifts, concrete pad setup and end-of-lease removal. Refurbished capital ranges cover pre-owned stock units overhauled before delivery. New turnkey ranges reflect multi-unit Irish school block pricing at €2,300 to €3,500/m² ex VAT (13.5% VAT on qualifying supply-and-fit construction). ESB Networks three-phase upgrades, foul pump stations and link corridors depend on yard survey.
Three steps from yard check to crane lift
- Price your unit count onlineSelect hire, refurbished or new multi-unit blocks and unit count to check weekly and capital ranges before giving a phone number.
- One supplier checks crane & servicesYour brief reaches one local supplier to measure school gate widths, overhead wires, ESB three-phase spare load and sewer falls.
- Craned in during school holidaysPads and service ducts go in beforehand so stock or factory modules crane onto site cleanly over Easter, mid-term or Summer.
A bare weekly headline, or an all-in unit quote
Bare weekly headline
- Low weekly rent quoted with craneage, haulage and removal hidden
- Three-phase power upgrades and Part M ramps left as late surprises
- Five sales reps phoning the school secretary from one enquiry
All-in unit quote
- Weekly hire, refurbished and block ranges shown before contact details
- Haulage, mobile crane lift, concrete pads and removal listed line by line
- One local modular supplier inspects the yard and prices in writing
Four questions schools ask before requesting a price
- Will I be hounded with calls?
- No. Your outline goes strictly to a single local modular supplier in your county, never to a shared broker list or five competing yards.
- What extra fees sit outside weekly prefab hire?
- Every hire lease carries one-off transport, mobile crane lift, foundation pad setup and end-of-lease removal charges, typically €14,000 to €24,000 ex VAT for a single classroom and €26,000 to €48,000 for 2 to 3 units.
- Can stock or refurbished classrooms open by September?
- Yes, when ordered early enough for pad pours and FSC/DAC filings. Refurbished stock units deploy in 4 to 8 weeks; multi-storey blocks need 14 to 24 weeks.
- When does a temporary prefab skip full planning?
- Under Class 20D (S.I. No. 114 of 2021), existing schools may install temporary units up to 5 years and 30% of floor area (max 2 storeys). Fire Safety and Disability Access Certificates still apply.

Check your unit rate before anyone phones
Pick the unit format, room count and hire or purchase route. When you want a site-verified quotation, your outline reaches a single local modular supplier in your county.
Hire vs refurbished purchase vs new multi-unit blocks
Compare weekly lease spend against capital outlay before signing a three-year rental contract.
12–36 mo Hire
- Typical Irish rate (ex VAT)
- €450–€850/wk/unit
- Delivery, crane & pads
- €14,000–€24,000 (1 unit incl. removal)
- Speed to pupil handover
- 4 to 8 weeks
- Suited to
- Decant swings & short surges
Refurbished Buy
- Typical Irish rate (ex VAT)
- €68,000–€105,000/unit
- Delivery, crane & pads
- Included in installed unit guide
- Speed to pupil handover
- 5 to 10 weeks
- Suited to
- Tight capital budgets & quick space
New 2-Storey Block
- Typical Irish rate (ex VAT)
- €2,300–€3,500/m²
- Delivery, crane & pads
- Included in turnkey m² rate
- Speed to pupil handover
- 14 to 24 weeks
- Suited to
- 4 to 12+ room campus growth
See the full three-year break-even maths, crane fees and demobilisation charges on hire vs buy vs refurbished classrooms and Irish modular classroom prices.
How unit count changes weekly rent and crane days
Scaling from one classroom to a six-room block lowers per-unit crane cost but triggers three-phase ESB checks.
Across Ireland's 3,938 recognised primary, special and post-primary schools, short-term surges and major building decants rely on stock hire fleets and overhauled prefabs that lift onto prepared pads in 1 to 2 days for a single classroom or 4 to 7 days for a 4 to 6 unit block. Read holiday crane scheduling.
Planning, fire safety and site tie-ins in brief
Four checks stop summer deliveries slipping into September.
- Class 20D temporary exemption (5 years, 30% cap). Existing schools may erect temporary modular classrooms up to two storeys without full planning provided statutory setbacks and TGD standards are met.
- Section 179 and full planning retention. Council-owned projects follow Section 179 / Part 8 consultation. Prefabs staying past five years or breaching 30% need full planning or retention permission.
- Fire Safety Certificate (FSC) & Disability Access Certificate (DAC). Temporary classrooms occupied by pupils still require Part B fire sign-off, I.S. 3218 alarm links, Part M ramps and DAC approval.
- Three-phase ESB load & foul drainage. Clusters of two or more heated classrooms usually require three-phase power, an ESB Networks IMIC load check and verified gravity or pumped foul tie-ins.
Full legal walkthroughs: planning, Section 179 and temporary retention, FSC, DAC, ramps and link corridors and three-phase ESB and drainage tie-ins.
Haulage and crane coverage in all 26 counties
Pick your county in the unit planner so a supplier serving your region checks gate widths and escort routes.
Wide-load low-loaders hauling 3.2 m to 4.2 m modular bays cost markedly more when dispatched across three provinces. Read regional logistics notes for Dublin, Cork, Galway & the West, Limerick & Mid-West, Kildare, Meath, Wicklow & Louth and all 26 counties.
Five lines every modular classroom quote must itemise
Spot hidden crane, service and removal charges before signing.
- Weekly hire rate versus total lease spend. Confirm the exact weekly fee, minimum lease period (12, 24 or 36 months) and extension roll-over rate.
- One-way haulage and abnormal-load escorts. Ask whether low-loader delivery from the supplier depot includes Garda escort or council road permits.
- Mobile crane capacity and lift plan. Verify crane tonnage, spreader beams, outrigger timber mats, slinger crew and lift insurance are priced in.
- End-of-lease removal and site reinstatement. Get the crane-out, disconnection, haulage-back and tarmac or grass repair charges written down on day one.
- Concrete pad foundations and levelling jacks. State clearly who excavates, pours concrete pads or sets jackleg piers prior to crane day.
Read the complete ten-point procurement checklist on unit prices in Ireland.
Common questions from school boards
How much does it cost to hire a temporary prefab classroom in Ireland?
Hiring a single temporary prefabricated classroom in Ireland runs €450 to €850 per week ex VAT on a 12 to 36 month lease. Budget a separate one-off mobilisation and demobilisation allowance of €14,000 to €24,000 ex VAT for low-loader haulage, mobile crane lifts, pad setup and end-of-lease removal. See prefab hire rates.
What does a multi-classroom 2-storey school block cost per m²?
Multi-unit permanent modular school blocks (4 to 12 classrooms across one or two storeys) typically price at €2,300 to €3,500/m² turnkey ex VAT, covering factory steel modules, crane assembly, staircases, acoustic finishes and standard pad foundations before abnormal ESB or drainage upgrades. See multi-classroom blocks.
Are refurbished pre-owned school prefabs worth buying over hiring?
If your school needs space for more than 24 to 30 months, buying a refurbished pre-owned prefab (€68,000 to €105,000 ex VAT per unit) often costs less than paying 36 months of lease fees plus removal. Compare hire vs buy vs refurbished.
How quickly can stock or refurbished modular classrooms be installed?
Available stock hire units and refurbished prefabs typically move from confirmed order to pupil handover in 4 to 8 weeks, subject to concrete pads, services and FSC/DAC status. Holiday crane schedules.
Do temporary school prefabs need planning permission, FSC and DAC?
Under Class 20D (S.I. No. 114 of 2021), existing Irish schools can place temporary prefabricated structures for up to 5 years without full planning permission when total temporary area stays within 30% of the existing school and no higher than 2 storeys. Fire Safety Certificate (FSC) and Disability Access Certificate (DAC) requirements still apply before pupils enter. Planning & retention rules.
Who pays for crane removal when a classroom lease ends?
End-of-lease demobilisation (disconnection, mobile crane lift-out, return haulage and pad/tarmac reinstatement) is almost always billed to the school, running €4,500 to €9,500 per unit plus yard repairs. Removal & relocation guide.
What VAT rate applies to classroom hire vs permanent turnkey purchase?
Modular classroom leasing and supply-only prefab sales carry 23% VAT in Ireland. Qualifying fixed turnkey supply-and-install construction contracts carry 13.5% VAT under Revenue's two-thirds rule.
Who rings me after I use the unit estimator?
Your unit outline and phone number go to a single local modular supplier in your county, and nobody else. That supplier checks site access, crane reach and tie-ins and sends a written quote.
Every modular classrooms guide and county page
Units & campus blocks
Hiring, crane & compliance
Regional logistics
modularclassrooms.ie is an independent Irish information site. It is not affiliated with the Department of Education, the NCSE or any local authority, and does not allocate school capital or hire grants.
