Modular and prefab classrooms in Cork City & County

Schools, ETBs and childcare operators in Cork City & County typically hire temporary classrooms at €450 to €850/wk ex VAT, buy refurbished stock from €68,000 or commission 2-storey blocks at €2,300 to €3,500/m².

Temporary classroom hire, refurbished pre-owned prefabs, decant swing space and multi-classroom campus blocks delivered across Cork City & County.

Free, no obligation. One local supplier prices it, not five.

  • €450–€850/wkCork prefab hire, ex VAT
  • €2,300–€3,500/m²multi-unit turnkey block, ex VAT
  • 4–8 wksstock prefab lift to handover
  • €14,000–€24,0001-unit haulage, crane & removal
Two parallel rows of white-and-anthracite steel-framed temporary prefabricated modular units with shuttered windows under cloudy skies

Delivery, crane access and services in Cork City & County

Planning & Building Control

What to check in Cork
Handled via Cork City Council and Cork County Council. Verify Class 20D 5-year / 30% limits and lodge FSC/DAC early.

Road access & craneage

What to check in Cork
Longer county haul runs to West Cork and steep hilly city campuses mean crane outrigger mats, articulated low-loader turning bays and escorted movements need clear pricing up front.

Grid, drainage & weather

What to check in Cork
Coastal exposure from Cobh to Kinsale and Bantry favours hot-dip galvanised steel chassis, marine-grade plastisol or powder-coated cladding and stainless external fixings.

Most common campus formats

What to check in Cork
Rapid summer-holiday hire classrooms in Ballincollig, Carrigaline, Midleton and Douglas, plus decant classrooms during roof and M&E upgrade contracts.

For every project in Cork City & County, start with a physical swept-path check at the school entrance gate and an early look at your main electrical distribution board. Review Easter and Summer crane windows and three-phase ESB load checks before committing to handover dates.

Price my units

Four quick taps show Irish unit hire or capital guides before asking for a contact number. One local supplier prices it, not five.

Temporary prefab classroom hire, 2 to 3 units, 12 to 24 month lease, in Co. Cork: €1,000 to €2,550/wk ex VAT plus €26,000 to €48,000 one-off delivery, crane & removal.

Step 1 of 5

What kind of classroom units do you need?

Pick the closest fit. A supplier checks yard levels and tie-ins on site.

How the unit guide is worked out

Weekly hire bands reflect standard Irish 12 to 24 month and 36+ month education lease rates per classroom module, excluding VAT (23% on rental). One-off mobilisation and demobilisation covers low-loader haulage, mobile crane lifts, concrete pad setup and end-of-lease removal. Refurbished capital ranges cover pre-owned stock units overhauled before delivery. New turnkey ranges reflect multi-unit Irish school block pricing at €2,300 to €3,500/m² ex VAT (13.5% VAT on qualifying supply-and-fit construction). ESB Networks three-phase upgrades, foul pump stations and link corridors depend on yard survey.

Hiring vs buying in Cork

If your campus needs swing accommodation during a 12 to 24 month building contract, a leased decant cluster keeps capital free and transfers unit refurbishment to the hire yard. Where enrolment growth is locked in for four or more years, compare a refurbished capital purchase (€68,000 to €105,000/unit) or a permanent two-storey wing on hire vs buy vs refurbished.

  • Weekly hire rate versus total lease spend. Confirm the exact weekly fee, minimum lease period (12, 24 or 36 months) and extension roll-over rate.
  • One-way haulage and abnormal-load escorts. Ask whether low-loader delivery from the supplier depot includes Garda escort or council road permits.
  • Mobile crane capacity and lift plan. Verify crane tonnage, spreader beams, outrigger timber mats, slinger crew and lift insurance are priced in.
  • End-of-lease removal and site reinstatement. Get the crane-out, disconnection, haulage-back and tarmac or grass repair charges written down on day one.

Common questions from school boards

How much is prefab classroom hire in Cork?

Hiring a single temporary prefabricated classroom in Ireland runs €450 to €850 per week ex VAT on a 12 to 36 month lease. Budget a separate one-off mobilisation and demobilisation allowance of €14,000 to €24,000 ex VAT for low-loader haulage, mobile crane lifts, pad setup and end-of-lease removal.

Which local authorities handle planning, FSC and DAC in Cork City & County?

Applications are lodged with Cork City Council and Cork County Council via the national BCMS portal for Building Control certificates.

Can a 4-classroom block be craned into a Cork school over summer?

Yes, provided FSC/DAC submissions, concrete pads and service trenches are completed before the school closes in late June. Crane lifts for 4 to 6 units take 4 to 7 days.

Who prices my modular classrooms enquiry in Cork?

Your unit outline and phone number go to a single local modular supplier in your county, and nobody else. That supplier checks site access, crane reach and tie-ins and sends a written quote.

Every modular classrooms guide and county page

modularclassrooms.ie is an independent Irish information site. It is not affiliated with the Department of Education, the NCSE or any local authority, and does not allocate school capital or hire grants.

Two-storey modern school campus building with grid windows, gravel footpath and staked young trees on a green lawn

Check your unit rate before anyone phones

Pick the unit format, room count and hire or purchase route. When you want a site-verified quotation, your outline reaches a single local modular supplier in your county.