Childcare, afterschool and ETB training hub units

Childcare, afterschool and ETB training modular units hire from €420/wk ex VAT or buy from €125,000 refurbished/turnkey, fitted to Tusla, Part B fire and Part M accessibility standards.

Rapid-deploy modular buildings for wraparound school-age childcare, sessional pre-schools and ETB adult education centres across Ireland.

Free, no obligation. One local supplier prices it, not five.

  • From €420/wkchildcare or ETB unit hire, ex VAT
  • From €125,000turnkey purchase option, ex VAT
  • 4–8 wksrapid stock unit deployment
  • Tusla & Part Mcompliant glazing, WCs & ramps
Bright early-years and afterschool learning room with timber tables, low chairs, storage units and tall daylight windows

Modular units for school-age childcare and ETB centres

Demand for on-site afterschool care on primary school grounds and flexible Further Education and Training (FET) rooms across Ireland's 16 Education and Training Boards (ETBs) has surged. Prefabricated and modular units let childcare operators and ETB campuses launch registered spaces in weeks without waiting years for permanent bricks-and-mortar leases.

Breakfast & afterschool club on school grounds

Typical room size
60 to 100 m²
Compliance & layout features
Direct yard access, low child sinks, secure keypad lobby, kitchenette, outdoor play fence
Guide route (ex VAT)
Hire €410–€720/wk / Refurb €66,000–€110,000

Standalone ECCE / sessional pre-school

Typical room size
80 to 140 m²
Compliance & layout features
Tusla floor-space ratios per child, nappy-change area, viewing glazing, finger-guard doors
Guide route (ex VAT)
Buy new €176,000–€268,000

ETB adult education & Further Ed classroom

Typical room size
80 to 240 m²
Compliance & layout features
Acoustic partitions, wide adult desks, AV projection, tea dock, Part M WC and ramp
Guide route (ex VAT)
2–3 unit hire €820–€2,160/wk

Apprenticeship & practical training workshop

Typical room size
120 to 300 m²
Compliance & layout features
High-ceiling steel modules, three-phase workshop power, roller shutter bay, welfare room
Guide route (ex VAT)
Multi-unit block €2,300–€3,500/m²

For wraparound childcare clubs sitting on a school yard, leasing a 60 to 80 m² refurbished classroom aligns monthly rent directly with fee income and removes heavy upfront debt.

Price my units

Four quick taps show Irish unit hire or capital guides before asking for a contact number. One local supplier prices it, not five.

Childcare, ETB or custom modular units, 2 to 3 units, 36+ month lease: €820 to €2,160/wk ex VAT plus €26,000 to €48,000 one-off delivery, crane & removal.

Step 1 of 5

What kind of classroom units do you need?

Pick the closest fit. A supplier checks yard levels and tie-ins on site.

How the unit guide is worked out

Weekly hire bands reflect standard Irish 12 to 24 month and 36+ month education lease rates per classroom module, excluding VAT (23% on rental). One-off mobilisation and demobilisation covers low-loader haulage, mobile crane lifts, concrete pad setup and end-of-lease removal. Refurbished capital ranges cover pre-owned stock units overhauled before delivery. New turnkey ranges reflect multi-unit Irish school block pricing at €2,300 to €3,500/m² ex VAT (13.5% VAT on qualifying supply-and-fit construction). ESB Networks three-phase upgrades, foul pump stations and link corridors depend on yard survey.

Early-years and ETB compliance checks before ordering

  • Tusla Early Years Inspectorate space rules. Confirm exact clear usable floor space per child (excluding kitchens, toilets, lobbies and storage) before locking module bay dimensions.
  • Safety glazing, finger guards and thermostatic mixers. Specify low-surface-temperature radiators or high-mounted split units, anti-finger-trap hinges and TMV3 scalding protection on every child tap.
  • Planning permission for non-school childcare use. Class 20D exemptions apply strictly to recognised schools; standalone commercial crèches or private afterschool units on leased plots normally require full planning permission.
  • Fire Safety Certificate and DAC. Both childcare centres and ETB training buildings are non-domestic occupancies requiring FSC and DAC sign-off prior to opening.

Check statutory routes on planning, Section 179 and temporary retention and FSC, DAC and ramps.

Common questions from school boards

How much does a modular afterschool or childcare unit cost in Ireland?

Hired single units start from €420/wk ex VAT on a 36-month term; refurbished pre-owned units start around €66,000 to €110,000 and brand-new Tusla-ready modular rooms run €176,000 to €268,000 ex VAT.

Can an afterschool club on primary school grounds use Class 20D exemption?

Check carefully with your local planning authority via an €80 Section 5 declaration. Class 20D is framed around temporary structures for recognised schools, so third-party commercial childcare operations often need explicit planning permission.

Do ETB training hubs support heavy three-phase workshop equipment?

Yes. Industrial-grade modular bays can be specified with reinforced floors, 3 m+ internal ceiling heights and three-phase distribution boards.

Every modular classrooms guide and county page

modularclassrooms.ie is an independent Irish information site. It is not affiliated with the Department of Education, the NCSE or any local authority, and does not allocate school capital or hire grants.

Two-storey modern school campus building with grid windows, gravel footpath and staked young trees on a green lawn

Check your unit rate before anyone phones

Pick the unit format, room count and hire or purchase route. When you want a site-verified quotation, your outline reaches a single local modular supplier in your county.