Multi-classroom 2-storey school campus blocks

Multi-unit permanent modular school blocks (4 to 12 classrooms across one or two storeys) typically price at €2,300 to €3,500/m² turnkey ex VAT, covering factory steel modules, crane assembly, staircases, acoustic finishes and standard pad foundations before abnormal ESB or drainage upgrades.

Four to twelve modular rooms stacked over two storeys to preserve school yard space, priced turnkey per square metre or on multi-year leases.

Free, no obligation. One local supplier prices it, not five.

  • €2,300–€3,500/m²multi-unit permanent turnkey, ex VAT
  • 4 to 12+ rooms2-storey campus block capacity
  • 14–24 wksoff-site fabrication to handover
  • 4 to 7 dayson-site crane assembly (4–6 units)
Two-storey modern school campus building with grid windows, gravel footpath and staked young trees on a green lawn

Why urban Irish schools stack two storeys

On tight suburban and city school sites where losing a basketball court or yard play space is unacceptable, stacking four to twelve modular classrooms over two storeys halves the ground footprint. Structural hot-rolled or heavy cold-formed steel frames carry upper floor loads, integrated acoustic concrete or composite decks dampen footstep transfer between floors, and weatherproof external or internal staircases connect both levels.

4-classroom 2-storey wing

Approx. gross area
350 to 420 m²
Turnkey capital guide (ex VAT)
€730,000–€1,596,000
36+ mo hire guide (ex VAT)
€1,820–€4,620/wk

6-classroom + WC & stairs

Approx. gross area
500 to 620 m²
Turnkey capital guide (ex VAT)
€1,150,000–€1,850,000
36+ mo hire guide (ex VAT)
€1,820–€4,620/wk+

8 to 12 room campus block

Approx. gross area
700 to 1,100 m²
Turnkey capital guide (ex VAT)
€1,248,000–€2,744,000
36+ mo hire guide (ex VAT)
€3,120–€7,940/wk

Per-square-metre rates improve slightly as block size grows because mobilisation, design certification and crane setup amortise across more bays. Check how a stacked wing affects three-phase ESB load and Part M lift and staircase requirements.

Price my units

Four quick taps show Irish unit hire or capital guides before asking for a contact number. One local supplier prices it, not five.

A multi-classroom 2-storey campus block, 4 to 6 units, new turnkey purchase: €730,000 to €1,596,000 ex VAT.

Step 1 of 5

What kind of classroom units do you need?

Pick the closest fit. A supplier checks yard levels and tie-ins on site.

How the unit guide is worked out

Weekly hire bands reflect standard Irish 12 to 24 month and 36+ month education lease rates per classroom module, excluding VAT (23% on rental). One-off mobilisation and demobilisation covers low-loader haulage, mobile crane lifts, concrete pad setup and end-of-lease removal. Refurbished capital ranges cover pre-owned stock units overhauled before delivery. New turnkey ranges reflect multi-unit Irish school block pricing at €2,300 to €3,500/m² ex VAT (13.5% VAT on qualifying supply-and-fit construction). ESB Networks three-phase upgrades, foul pump stations and link corridors depend on yard survey.

Staircases, lifts, link corridors and site civils

Going above ground floor changes your building control and civil scope compared with single-storey ground units:

  1. Platform or passenger lift for Part M DAC. Any two-storey school block with upper teaching spaces needs lift access alongside compliant ambulant stairs so wheelchair users reach every floor.
  2. Reinforced concrete pads or strip footings. Stacked modules concentrate vertical column loads at bay corners; geotechnical trial holes confirm safe ground bearing before pouring.
  3. Internal fire-protected corridors and dual escape stairs. Longer multi-classroom wings require 60-minute compartmentation and protected escape routes to satisfy Part B Fire Safety Certification.
  4. High-tonnage crane positioning. Lifting second-storey bays over lower modules typically calls for a 100-tonne to 200-tonne all-terrain crane with steel road mats and cleared overhead cables.

Common questions from school boards

How much does a multi-classroom 2-storey modular block cost in Ireland?

Multi-unit permanent modular school blocks (4 to 12 classrooms across one or two storeys) typically price at €2,300 to €3,500/m² turnkey ex VAT, covering factory steel modules, crane assembly, staircases, acoustic finishes and standard pad foundations before abnormal ESB or drainage upgrades.

Can a two-storey school block be hired rather than bought?

Yes. Several Irish suppliers lease stacked 4 to 12 room blocks on 24 to 60 month agreements, typically running €1,820 to €4,620/wk ex VAT for 4 to 6 rooms plus substantial mobilisation and demobilisation civils.

Does Class 20D allow two-storey temporary school blocks?

Yes, up to 2 storeys, provided total temporary area stays within 30% of existing school area and stays on site no longer than 5 years. Permanent multi-storey wings need full planning.

How long does crane assembly take for a 4 to 6 classroom block?

Once concrete foundations cure, crane assembly of the structural modules typically takes 4 to 7 days, followed by 3 to 5 weeks of weatherproofing, internal jointing, staircase fit-out and commissioning.

Every modular classrooms guide and county page

modularclassrooms.ie is an independent Irish information site. It is not affiliated with the Department of Education, the NCSE or any local authority, and does not allocate school capital or hire grants.

Two-storey modern school campus building with grid windows, gravel footpath and staked young trees on a green lawn

Check your unit rate before anyone phones

Pick the unit format, room count and hire or purchase route. When you want a site-verified quotation, your outline reaches a single local modular supplier in your county.