Modular classroom questions, answered plainly
Weekly hire costs, crane and removal fees, refurbished prefabs, decant swings, Class 20D planning, FSC/DAC, link corridors and ESB power.
Free, no obligation. One local supplier prices it, not five.
- €450–€850/wkprefab classroom hire, ex VAT
- €2,300–€3,500/m²multi-unit block turnkey
- 4–8 wksstock prefab handover
- 5 yrs / 30%Class 20D temporary cap
Price my units
Four quick taps show Irish unit hire or capital guides before asking for a contact number. One local supplier prices it, not five.
Temporary prefab classroom hire, 2 to 3 units, 12 to 24 month lease: €1,000 to €2,550/wk ex VAT plus €26,000 to €48,000 one-off delivery, crane & removal.
How the unit guide is worked out
Weekly hire bands reflect standard Irish 12 to 24 month and 36+ month education lease rates per classroom module, excluding VAT (23% on rental). One-off mobilisation and demobilisation covers low-loader haulage, mobile crane lifts, concrete pad setup and end-of-lease removal. Refurbished capital ranges cover pre-owned stock units overhauled before delivery. New turnkey ranges reflect multi-unit Irish school block pricing at €2,300 to €3,500/m² ex VAT (13.5% VAT on qualifying supply-and-fit construction). ESB Networks three-phase upgrades, foul pump stations and link corridors depend on yard survey.
Modular classroom questions, start to finish
How much does temporary prefab classroom hire cost in Ireland?
Hiring a single temporary prefabricated classroom in Ireland runs €450 to €850 per week ex VAT on a 12 to 36 month lease. Budget a separate one-off mobilisation and demobilisation allowance of €14,000 to €24,000 ex VAT for low-loader haulage, mobile crane lifts, pad setup and end-of-lease removal.
What does a multi-classroom 2-storey school block cost?
Multi-unit permanent modular school blocks (4 to 12 classrooms across one or two storeys) typically price at €2,300 to €3,500/m² turnkey ex VAT, covering factory steel modules, crane assembly, staircases, acoustic finishes and standard pad foundations before abnormal ESB or drainage upgrades.
How much does a refurbished pre-owned school prefab cost to buy?
Pre-owned refurbished school prefabs start from €68,000 to €105,000 per classroom unit ex VAT, delivered and craned in 5 to 10 weeks after fresh flooring, re-cladding checks, LED lighting and electrical certification.
What one-off fees apply on top of weekly classroom rental?
Expect separate line items for low-loader delivery (€1,500 to €4,000/bay), mobile craneage (€1,200 to €3,500/day), pad foundations (€6,500 to €14,000 single unit), M&E tie-ins and end-of-lease removal (€4,500 to €9,500/unit).
When is buying a refurbished prefab cheaper than hiring?
Around month 24 to 30 on a standard classroom. By 36 months, cumulative weekly rent plus mobilisation and removal frequently matches or exceeds buying a refurbished pre-owned unit outright.
Do temporary school classrooms require planning permission?
Under Class 20D (S.I. No. 114 of 2021), existing Irish schools can place temporary prefabricated structures for up to 5 years without full planning permission when total temporary area stays within 30% of the existing school and no higher than 2 storeys. Fire Safety Certificate (FSC) and Disability Access Certificate (DAC) requirements still apply before pupils enter.
When does Section 179 apply to modular classrooms?
Section 179 (Part 8) of the Planning and Development Act 2000 governs public consultation when a local authority builds on its own land, such as council-delivered community education hubs. Most primary, voluntary secondary and ETB schools instead use Class 20D, Class 57 or standard planning.
Do temporary prefabs still need a Fire Safety Certificate and DAC?
Yes. Building Regulations apply regardless of whether a classroom is leased for two years or purchased permanently. FSC and DAC approval must be secured before students occupy the building.
Can classrooms be craned in over Easter or Summer holidays?
Yes. Pads and underground ducts are installed first so modules lift in 1 to 2 days (1 unit) or 4 to 7 days (4 to 6 units) while the yard is empty.
Can our existing school electrical supply run three new prefabs?
Rarely on a single-phase supply. Multiple electrically heated classrooms usually require three-phase power and an ESB Networks Increase Maximum Import Capacity (IMIC) assessment.
How do you connect modular classrooms to an existing school building?
Weatherproof insulated link corridors (typically €2,800 to €5,200/m) tie the new block to an existing fire door or lobby, with Part M ramps (€6,500 to €16,500) at external thresholds.
Can an owned prefab classroom be relocated to another school?
Yes. Relocating a modular unit across the same yard costs roughly €8,500 to €18,000 ex VAT; moving it by low-loader to another campus runs €14,000 to €29,000 ex VAT plus new pads and tie-ins.
What VAT rate applies to classroom hire vs permanent turnkey blocks?
Modular classroom leasing and supply-only prefab sales carry 23% VAT in Ireland. Qualifying fixed turnkey supply-and-install construction contracts carry 13.5% VAT under Revenue's two-thirds rule.
Is modularclassrooms.ie part of the Department of Education?
modularclassrooms.ie is an independent Irish information site. It is not affiliated with the Department of Education, the NCSE or any local authority, and does not allocate school capital or hire grants.
Who contacts me after I submit the unit estimator?
Your unit outline and phone number go to a single local modular supplier in your county, and nobody else. That supplier checks site access, crane reach and tie-ins and sends a written quote.
Every modular classrooms guide and county page
Units & campus blocks
Hiring, crane & compliance
Regional logistics
modularclassrooms.ie is an independent Irish information site. It is not affiliated with the Department of Education, the NCSE or any local authority, and does not allocate school capital or hire grants.

Check your unit rate before anyone phones
Pick the unit format, room count and hire or purchase route. When you want a site-verified quotation, your outline reaches a single local modular supplier in your county.